Skip Navigation
 |
|
|
|
|
|
|
|
|
Free patterns, product alerts & special offers. |
|
|
|
|
|
|
|
|
| Retail Store New York City |
|
|
| Retail Store New Jersey |
|
|
|
|
|
|
|
|
| Vanna's Sweepstakes |
|
|
|
 |
|
|
|
|
| |
Free Knitting Pattern:
Gossamer Cowl Pullover
|
Lion Brandฎ LB Collection® Silk Mohair
Pattern #: 90100AD |
|
Most current review /
Write a review
SKILL LEVEL: Intermediate
SIZE: Small, Medium, Large, 1X, 2X Finished Bust 36 (38, 40, 44, 48) in. (91.5 (96.5, 101.5, 112, 122) cm)
Finished Length 23 1/2 (24 1/4, 24 3/4, 25 1/2, 26 1/2) in. (59.5 (61.5, 63, 65, 67.5) cm)
Note: Pattern is written for smallest size with changes for larger sizes in parentheses. When only one number is given, it applies to all sizes. To follow pattern more easily, circle all numbers pertaining to your size before beginning.
CORRECTIONS: None
|
|
|
|
 |
| This lightweight sweater features classic cable details and a flattering cowl neck. |
|
|
|
|
|
|
|
|
| To change colors, simply select color name from the drop-down above or else click the swatch you want to change and then click a color below |
|
LB Collection® Silk Mohair
 |
 |
 |
 |
 |
 |
| Wisp |
Azure |
Sunset |
Iris |
Midnight |
Sunbeam |
|
| *LB Collection® Silk Mohair
(Article #484). 70% Super Kid Mohair, 30% Silk; package size: 0.88oz/25.00 gr. (231yds/212m) pull skeins |
 |
|
|
|
You can also buy materials separately
|
|
MATERIALS To
change colors, click the drop-down list or swatches above |
QUANTITY |
PRICE |
ALT QTY |
|
|
|
| |
|
|
|
Gossamer Cowl Pullover
Lion Brandฎ LB Collection® Silk Mohair
GAUGE: 22 sts + 28 rows = 4 in. (10 cm) in rev St st (p on RS, k on WS) with smaller needles and 2 strands of yarn held tog. BE SURE TO CHECK YOUR GAUGE. When you match the gauge in a pattern, your project will be the size specified in the pattern and the materials specified in the pattern will be sufficient. If it takes you fewer stitches and rows to make a 4 in. [10 cm] square, try using a smaller size hook or needles; if more stitches and rows, try a larger size hook or needles.
STITCH EXPLANATION: 7/7 LC (7 over 7 left cross) Slip 7 sts to cable needle and hold in front, k7, then k7 from cable needle.
7/7 RC (7 over 7 right cross) Slip 7 sts to cable needle and hold in back, k7, then k7 from cable needle.
skp Slip 1, knit 1, pass slip stitch over knit stitch.
sk2p Slip 1 as if to knit, knit 2 together, pass slipped stitch over2 sts decreased.
M1 (make 1) An increase worked by lifting horizontal thread lying between needles and placing it onto left needle. Knit this new stitch through the back loop.
M1 as if to purl (make 1 st as if to purl) An increase worked by lifting the horizontal thread lying between the needles and placing it onto the left needle. Purl this new stitch through the back loop.
PATTERN STITCHES
Cable Panel (over 21 sts)
Row 1 (RS): Knit.
Row 2: Purl.
Rows 3-6: Rep Rows 1 and 2.
Row 7: 7/7 LC, k7.
Row 8: Purl.
Row 9: Knit.
Rows 10-17: Rep Rows 8 and 9.
Row 18: Purl.
Row 19: K7, 7/7 RC.
Rows 20-24: Rep Rows 8-12.
Rep Rows 124 for Cable Panel.
K1, p2 Rib
Row 1 (RS): *K1, p2; rep from * to end.
Row 2: K the knit sts and p the purl sts.
Rep Row 2 for K1, p2 Rib.
|
NOTES: 1. Pullover is worked holding 2 strands of yarn tog throughout.
2. Smaller needles are used for Back, Fronts and Sleeves. Larger needles are used for Ribbing and Collar only.
|
|
 PULLOVER BACK
With smaller needles and 2 strands of yarn held tog, cast on 111 (115, 119, 131, 139) sts.
Row 1 (RS): P12 (13, 14, 18, 20) (for rev St st), *work Row 1 of Cable Panel, p12 (13, 14, 16, 18) (for rev St st); rep from * once more; work Row 1 of Cable Panel), p12 (13, 14, 18, 20) (for rev St st).
Row 2: K12 (13, 14, 18, 20), *work Row 2 of Cable Panel, k12 (13, 14, 16, 18); rep from * once more, work Row 2 of Cable Panel, k12 (13, 14, 18, 20).
Row 3: P12 (13, 14, 18, 20), *work next row of Cable Panel, p12 (13, 14, 16, 18); rep from * once more; work next row of Cable Panel, p12 (13, 14, 18, 20).
Row 4: K12 (13, 14, 18, 20), place marker (pm), *work next row of Cable Panel, k12 (13, 14, 16, 18), pm; rep from * once more, work next row of Cable Panel, k12 (13, 14, 18, 20).
Rows 5 and 6: Keeping sts in rev St st and Cable Panel as established, and slipping markers instead of placing markers, rep last 2 rows.
Next (Dec) Row (RS): P to 2 sts before marker, p2tog, *work next row of Cable Panel, p to 2 sts before next marker, p2tog; rep from * once more, work next row of Cable Panel, p2tog, p to end 107 (111, 115, 127, 135) sts at end of row.
Keeping sts in rev St st and Cable Panel as established, work 7 rows even (without any incs or decs).
Next (Dec) Row: Rep Dec Row 103 (107, 111, 123, 131) sts at end of row.
Rep last 8 rows 2 more times 95 (99, 103, 115, 123) sts when all decs completed. Remove markers.
Keeping sts in rev St st and Cable Panel as established, work even until piece measures 6 in. (15 cm) from beg, end with a WS row.
Next (Inc) Row (RS): P1, M1 as if to purl, work in pattern as established to last st, M1 as if to purl, p1 97 (101, 105, 117, 125) sts at end of row.
Keeping sts in rev St st and Cable Panel as established, work 3 rows even.
Next (Inc) Row: Rep Inc Row 99 (103, 107, 119, 127) sts at end of row.
Rep last 4 rows 6 more times 111 (115, 119, 131, 139) sts when all incs completed.
Keeping sts in rev St st and Cable Panel as established, work even until piece measures 12 in. (30.5 cm) from beg, end with a WS row.
Shape Armholes
Bind off 5 sts at beg of next 2 rows 101 (105, 109, 121, 129) sts.
Next (Dec) Row: K2, skp, work to last 4 sts, k2tog, k2 99 (103, 107, 119, 127) sts at end of row.
Next Row: Work even in pattern as established.
Rep last 2 rows 17 (19, 21, 20, 24) more times 65 (65, 65, 79, 79) sts when all decs completed.
Next (Dec) Row: K2, sk2p, work to last 5 sts, k3tog, k2 61 (61, 61, 75, 75) sts at end of row.
Next Row: Work even in pattern as established.
Rep last 2 rows 7 (7, 7, 10, 10) more times.
Place rem 33 (33, 33, 35, 35) sts on holder.
|
 FRONT
Work same as Back to armhole shaping.
Shape Armholes
Bind off 5 sts at beg of next 2 rows 101 (105, 109, 121, 129) sts.
Next (Dec) Row: K2, skp, work to last 4 sts, k2tog, k2 99 (103, 107, 119, 127) sts at end of row.
Next Row: Work even in pattern as established.
Rep last 2 rows 13 (15, 17, 16, 20) more times 73 (73, 73, 87, 87) sts when all decs completed.
Next (Dec) Row: K2, sk2p, work to last 5 sts, k3tog, k2 69 (69, 69, 83, 83) sts at end of row.
Next Row: Work even in pattern as established.
Rep last 2 rows 6 (6, 6, 9, 9) more times.
Place rem 45 (45, 45, 47, 47) sts on holder.
|
 LEFT SLEEVE
With smaller needles and 2 strands of yarn held tog, cast on 57 (59, 61, 65, 69) sts.
Row 1 (RS): K4 (5, 6, 8, 10) (for St stk on RS, p on WS), p14 (for rev St st), work Row 1 of Cable Panel, p14 (for St st), k4 (5, 6, 8, 10) (for rev St st).
Row 2: P4 (5, 6, 8, 10), k14, work Row 2 of Cable Panel, k14, p4 (5, 6, 8, 10).
Row 3: K4 (5, 6, 8, 10), p14, work Row 3 of Cable Panel, p14, k4 (5, 6, 8, 10).
Next (Inc) Row (WS): P1, M1 as if to purl, work in pattern as established to last st, M1 as if to purl, P1 59 (61, 63, 67, 71) sts at end of row.
Keeping sts in St st, rev St st and Cable Panel as established, work 3 rows even.
Next (Inc) Row: Rep Inc Row 61 (63, 65, 69, 73) sts at end of row.
Rep last 4 rows 6 more times 73 (75, 77, 81, 85) sts when all incs completed.
Keeping sts in St st, rev St st and Cable Panel as established, work 5 rows even.
Next (Inc) Row: Rep Inc Row 75 (77, 79, 83, 87) sts at end of row.
Rep last 6 rows 6 more times 87 (89, 91, 95, 99) sts when all incs completed.
Keeping sts in St st, rev St st and Cable Panel as established, work even until piece measures 12 in. (30.5 cm) from beg, end with a WS row.
Shape Cap
Bind off 5 sts at beg of next 2 rows 77 (79, 81, 85, 89) sts.
Next (Dec) Row (RS): K2, skp, work in pattern as established to last 4 sts, k2tog, k2 75 (77, 79, 83, 87) sts at end of row.
Next Row: Work even in pattern as established.
Next (Dec) Row: K2, skp, work in pattern as established to last 4 sts, k2tog, k2 73 (75, 77, 81, 85) sts at end of row.
Rep last 2 rows 19 (19, 17, 17, 17) more times 35 (37, 43, 47, 51) sts when all decs completed.
Sizes M (L, 1X, 2X) Only
Keeping sts in St st, rev St st and Cable Panel as established, work 3 rows even.
Next (Dec) Row: Rep Dec Row 35 (41, 45, 49) sts at end of row.
Sizes L (1X, 2X) Only
Rep last 4 rows 2 (3, 5) more times 37 (39, 39) sts when all decs completed.
Shape Top of Cap
Sizes S (M) Only
Bind off 7 sts at beg of the next 5 WS rows.
Sizes L (1X, 2X) Only
Bind off 7 sts at beg of next 3 (1, 1) WS rows, then 8 sts at beg of next 2 (4, 4) WS rows.
RIGHT SLEEVE
Work as for Left Sleeve to top of cap shaping.
Next Row (WS): Work even in pattern as established.
Shape Top of Cap
Sizes S (M) Only
Bind off 7 sts at beg of the next 5 RS rows.
Sizes L (1X, 2X) Only
Bind off 7 sts at beg of next 3 (1, 1) RS rows, then 8 sts at beg of next 2 (4, 4) RS rows.
|
FINISHING
Cuff Ribbing
From WS with larger needles and 2 strands of yarn held tog, pick up and k42 (45, 48, 51, 54) sts along lower edge of Sleeve.
Work in K1, P2 rib until cuff measures 5 in. (12.5 cm).
Bind off loosely. Rep for other Sleeve.
Lower Edge Ribbing
From WS with larger needles and 2 strands of yarn held tog, pick up and k93 (96, 99, 111, 120) sts along lower edge of Back.
Work in K1, p2 Rib until ribbing measures 4 in. (10 cm).
Bind off loosely. Rep for Front.
Sew raglan armhole seams, leaving the Back right seam open.
Collar
From RS with smaller needles and 2 strands of yarn held tog, k33 (33, 33, 35, 35) sts from Back neck holder, pick up and k33 (33, 36, 37, 37) sts evenly across top of left Sleeve, k45 (45, 45, 47, 47) sts from Front neck holder, pick up and k33 (33, 36, 37, 37) sts evenly across top of right Sleeve 144 (144, 150, 156, 156) sts at end of row.
Row 1: *K2, p1; rep from * to end.
Rows 2-5: K the knit sts and p the purl sts.
Change to larger needles.
Rows 6-8: Rep Row 2.
Mark a purl st at the approximate center at top of each sleeve.
Row 9 (Inc): Work in rib as established, working a M1 before first marker and after 2nd marker 146 (146, 152, 158, 158) sts at end of row.
Row 10: Rep Row 2.
Rows 11 and 12: Rep Rows 9 and 10 148 (148, 154, 160, 160) sts at end of row.
Row 13: Rep Row 9 150 (150, 156, 162, 162) sts at end of row.
Row 14: *K2, p1; rep from * to end.
Row 15 (Inc): Work in rib as established, working a M1 after first marker and before 2nd marker 152 (152, 158, 164, 164) sts at end of row.
Row 16: Rep Row 2.
Rows 17 and 18: Rep Rows 15 and 16 154 (154, 160, 166, 166) sts when all incs completed.
Row 19: Rep Row 15 156 (156, 162, 168, 168) sts at end of row.
Row 20: *K2, p1; rep from * to end.
Rep Rows 9-20 once more 168 (168, 174, 180, 180) sts when all incs completed.
Rep Row 2 until Collar measures 7 in. (18 cm) from beg.
Bind off loosely.
Sew rem raglan seam, then continue to sew Collar seam. Sew side and Sleeve seams. Weave in ends.
|
|
|
Learn to Knit instructions: http://learnToKnit.LionBrand.com
|
|
Ratings and Reviews
|
|
|
| Gossamer Cowl Pullover Reviewed by Alyce Estrem on 2011-02-05 |
 |
| This pattern is a mess. The cable pattern is wrong. 7/7RC should read k7, slip 7 on to cable needle, hold in back, k7, knit 7 from cable needle. The Sleeve and cowl portion of the pattern did not print out so I had to hand copy it. I haven't gotten to the sleeves or cowl yet but the pattern is awkwardly and confusingly written and seems to repeat itself. It should be interesting to try to make it come out right. Adding the lower edge ribbbing after the sweater is done is also odd and unnecessarily complicated. If I hadn;t come so far, I would scrap this sweater and make another style. It's awful!
|
|
|
|
|
When you are in New York City, visit the Lion Brand Yarn Studio at 34 W. 15th Street for a one-of-a-kind yarn lover's experience.
For more information, visit the website, LionBrandYarnStudio.com
|