Skip Navigation
 |
|
|
|
|
|
|
|
|
Free patterns, product alerts & special offers. |
|
|
|
|
|
|
|
|
| Retail Store New York City |
|
|
| Retail Store New Jersey |
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
Picot Hem Poncho
Lion Brand® Martha Stewart CraftsTM/MC Extra Soft Wool Blend
GAUGE: 19 sts + 27 rnds = 4 in. (10 cm) in St st worked in the rnd (k every rnd). BE SURE TO CHECK YOUR GAUGE. When you match the gauge in a pattern, your project will be the size specified in the pattern and the materials specified in the pattern will be sufficient. If it takes you fewer stitches and rows to make a 4 in. [10 cm] square, try using a smaller size hook or needles; if more stitches and rows, try a larger size hook or needles.
STITCH EXPLANATION: M1 (make 1) An increase worked by lifting horizontal thread lying between needles and placing it onto left needle. Knit this new stitch through the back loop - 1 st increased.
ssk (slip, slip, knit) Slip next 2 sts as if to knit, one at a time, to right needle; insert left needle into fronts of these 2 sts and knit them tog - 1 st decreased. |
NOTES: 1. Poncho is worked in rnds, beg at neck.
2. Poncho has folded hems at Neckband and lower edge. Neckband is folded across a purl turning ridge, and lower edge is folded across a picot edge.
3. If desired, when sts are sufficiently increased, change to longer circular needles.
|
|
 |
PONCHO
Neckband
With shorter circular needles, cast on 102 (106, 112) sts. Place marker for beg of rnd. Join by working the first st on left hand needle with the working yarn from the right hand needle and being careful not to twist sts.
Note: In next rnd, markers are placed for sides of Poncho, dividing sts in half. You may wish to use different color markers for side markers than for beg of rnd marker.
Rnd 1 (RS): K25 (26, 28), pm, k51 (53, 56), pm, k to end.
Rnd 2 (Decrease Rnd): (K to 2 sts before marker, ssk, sl marker, k1, k2tog) twice, k to end of rnd - 98 (102, 108) sts at the end of this rnd.
Sl markers as you come to them.
Rnds 3 and 4: Knit.
Rnds 5-10: Rep last 3 rnds 2 times - 90 (94, 100) sts rem.
Rnd 11 (Turning Ridge): Purl.
Body
Rnd 12: Knit.
Rnd 13 (Increase): (K to marker, M1, sl marker, k1, M1) twice, k to end - 94 (98, 104) sts at the end of this rnd.
Rnds 14 and 15: Knit.
Rep last 3 rnds 25 (29, 32) times - 194 (214, 232) sts when all increases are completed.
Picot Hem
Next Rnd (Picot Edge): *Yo, k2tog; rep from * around.
Knit 3 rnds.
Bind off.
FINISHING
Fold neckband to WS along turning ridge and sew in place. Fold picot hem to WS along picot edge and sew in place. Weave in ends.
|
|
|
Learn to Knit instructions: http://learnToKnit.LionBrand.com
|
|
Ratings and Reviews
|
|
|
|
When you are in New York City, visit the Lion Brand Yarn Studio at 34 W. 15th Street for a one-of-a-kind yarn lover's experience.
For more information, visit the website, LionBrandYarnStudio.com
|