STRIPED BAG
With A, cast on 50 sts. Knit 4 rows for top edge of Bag.
Next Row (RS): With B, knit.
Next Row (WS): With B, purl.
Continue in Stripe Sequence and St st (k on RS, p on WS) as established, until Stripe Sequence has been worked a total of 6 times.
Bind off.
FINISHING
Fold Bag in half and sew side and bottom seams.
Weave in ends.
Weave a 24 in. (61 cm) length of A through top of Bag for drawstring. Knot drawstring ends to prevent fraying.
TREE BAG
Note: Use a separate ball of yarn for each block of color. Pick up new color from under old color to twist yarns and prevent holes.
Work from Chart or from written instructions below. Work Chart rows from right to left on RS rows, from left to right on WS rows.
With B, cast on 25 sts.
Knit 4 rows.
Row 1(RS): With B, knit.
Rows 2-42: With B, continue in St st (k on RS, p on WS).
Rows 43 and 45: With B k4, with C k17, with B k4.
Row 44: With B p4, with C p17, with B p4.
Rows 46 and 48: With B p5, with C p15, with B p5.
Row 47: With B k5, with C k15, with B k5.
Rows 49 and 51: With B k6, with C k13, with B k6.
Row 50: With B p6, with C p13, with B p6.
Rows 52 and 54: With B p7, with C p11, with B p7.
Row 53: With B k7, with C k11, with B k7.
Rows 55 and 57: With B k8, with C k9, with B k8.
Row 56: With B p8, with C p9, with B p8.
Rows 58 and 60: With B p9, with C p7, with B p9.
Row 59: With B k9, with C k7, with B k9.
Rows 61 and 63: With B k10, with C k5, with B k10.
Row 62: With B p10, with C p5, with B p10.
Rows 64 and 66: With B p11, with C p3, with B p11.
Row 65: With B k11, with C k3, with B k11.
Rows 67 and 69: With B k12, with C k1, with B k12.
Row 68: With B p12, with C p1, with B p12.
With B, work in St st for 3 rows.
With B, knit 4 rows.
Bind off.
FINISHING
With A embroider random French Knots on tree and a straight st star at top of tree. Fold Bag in half and sew side seams.
Weave in ends.
Weave a 24 in. (61 cm) length of A through top of Bag for drawstring. Knot drawstring ends to prevent fraying.
|